Outokumpu appoints Päivi Allenius as head of communications
Helsinki - Päivi Allenius will be responsible for Outokumpu's communications globally and be based at the Outokumpu headquarters.
19. May 2021
Joint US-EU statement on addressing global steel excess capacity
Washington - Leaders from both sides agreed to chart a path that ends the WTO disputes following the U.S. application of tariffs on imports from the EU under section 232.
North America’s metals & mining: 10.50% rise of cross-border deals in Q1
London - A total of 50 cross border deals worth $1.34bn were announced for the region during Q1 2021.
14. May 2021
Mammoet transports massive modules for GCGV
Utrecht - Large SPMT fleet aids construction of Gulf Coast plastics facility.
Thyssenkrupp awards order for revamping of burner technology to Tenova
Castellanza - The furnace will be equipped with new burners that meet even highest requirements by targeting the lowest possible NOx-emission levels.
Thyssenkrupp with continued strong momentum in 2nd quarter 2020/2021
Essen - The group’s order intake was up 14 percent against the comparable prior-year period at €8.6 billion.
11. May 2021
Fives discharges first slab from highest capacity reheating furnace
Moscow - JSW Steel contracted Fives to design and supply two reheating furnaces for their new hot strip mill at Dolvi works in India.
Turkey's First Hybrid Industry Fair is on November 10-13, 2021
Istanbul - The fair on 'Industrial Transformation' will take place in a digital environment as well as the traditional physical fair.
6. May 2021
Habaş A.S. places order with SMS group to upgrade compact mill
Dusseldorf - With this project, Habaş intends to boost the mill capacity to 4.5 tons per year.
Industrial metals: Copper and tin reach record high prices
Frankfurt - Copper briefly rose above the USD 10,000 per ton mark for the first time in more than ten years.
4. May 2021
Metalloinvest to invest 6.4 billion roubles into electric arc furnace
Moscow - The capacity of EAF #5 will be 1.2 mn tonnes of liquid steel per year, and ISPU #4 will have a capacity of 1.3 mn tonnes per year.
ABB secures order from SSAB for modernization at Swedish mill
Zurich - SSAB Borlänge will be transformed for improved continuous operation and reduced energy consumption during three phase maintenance rollout.
28. Apr 2021
Page 106 of 256