London – At the production facility of India steel maker Rourkela Steel Plant of Steel Authority of India Limited(SAIL), a hot strip mill with an annual production capacity of three million metric tons, processed the first coil on January 31, 2020. The hot strip mill was supplied by Primetals Technologies.
3. Mar 2020